Welding-robot workstations · Welding fixtures · Valve-terminal air circuits · Sensor presence detection · Guide rails and carriages
The BIW welding shop is a core stage of vehicle production, using large numbers of welding robots to join body parts with precision. Shenpu Industrial provides complete automation component solutions for welding lines, covering welding workstations, fixture systems, pneumatic control, sensing and inspection, linear motion, and other key areas, to help ensure weld quality and takt time.
ABB IRB 6700, KUKA KR 16, and Yaskawa Motoman MA1440: payload 6–240 kg, reach 1.85–3.2 m, repeatability ±0.03 mm, supporting arc welding, spot welding, and laser welding.
Schunk / DESTACO pneumatic clamps, locating pins, and tool changers, clamping force 100–20,000 N, repeatability ±0.02 mm, for fully automatic fixture systems.
Festo CPX/MPA-L and SMC EX600 series, IO-Link communication, 16–64 points per station, response time <10 ms, meeting high-takt body-shop requirements.
Keyence LR-W/LR-X laser displacement sensors, Pepperl+Fuchs NBN/NCN proximity switches, TURCK BI magnetic switches, Sensing distance 2-300mm, Accuracy±0.01mm.
THK, NSK, and Rexroth linear guides and ball screws, sizes HGH15–65, carriage rated load 5–120 kN, with aluminum-profile worktables.
Siemens S7-1500 PLC, TIA Portal programming, PROFINET communication, paired with HMI HMI touch panels, inverters, servo drives, achieve full line automation control.
In a joint-venture automaker’s body shop with 300 ABB robots, the original torch-cleaning stations had aged, causing weld quality to decline.
Solutions: Supplied original BINZEL torch-cleaning stations, anti-spatter agent, and cleaning brushes, with quick-change modules, extending the torch-cleaning interval from once a week to once a month and raising first-pass weld yield from 92% to 98.5%.
On a new-energy automaker’s BIW welding line, the original fixture locating accuracy was no better than ±0.1 mm, affecting body dimensional accuracy.
Solutions: Used Schunk clamps, THK linear guides, and precision locating pins to achieve ±0.02 mm repeatability, with pneumatic valve terminals for fully automatic clamping, shortening cycle time by 15 seconds per unit.
On an OEM side-panel welding line, the pneumatic system used a lot of energy, with annual compressed-air costs of more than RMB 2 million.
Solutions: Deployed Festo MSE6 servo energy-saving modules, quick exhaust valves, and a pressure-optimization plan, lowering system pressure from 0.7 MPa to 0.5 MPa, with 30% annual energy savings and a payback period of <18 months.
At an automaker’s underbody welding station, manual visual inspection had a 2–3% missed-weld rate, affecting body strength.
Solutions: Introduced Keyence LR-X laser displacement sensors and a vision inspection system for 100% in-line inspection, reducing missed-weld escape to below 0.1%, with PLC automatic alarms and a traceability system.
Where technical requirements are met, we provide high-value domestic alternative solutions that can reduce procurement costs by 30–50%.
Brands such as Efort, Estun, and SIASUN offer six-axis welding robots with payloads of 6–210 kg, priced at about 60% of ABB/KUKA, suitable for mid-to-low-end vehicle models or retrofit projects.
AirTAC AirTAC, Mindman Mindman, solenoid valves, cylinders, valve terminals, and more products, performance close to SMC/Festo, price reduced by 40-50%.
Autonics, Panasonic, Omron(domestic Model), proximity switches, photoelectric switches, laser distance measurement, cost reduced by 30-40%.
Projects: Annual MRO purchasing for 300 ABB/KUKA robots in a body shop
Scope of supply: Spare-parts kits including welding torches, torch-cleaning stations, anti-spatter agent, copper brushes, sensors, pneumatic components, and guide rails and carriages
Engagement model: Annual framework agreements and VMI consignment-stock management
Results: Emergency spare-parts response shortened from 48 hours to 4 hours, annual purchasing cost reduced by 18%
Projects:BIW BIW welding lines new projects paired with
Scope of supply:Schunk fixture systems, Festo valve terminals, Keyence sensors, THK guide rails, Siemens PLC
Engagement model: integrated design + one-stop supply + on-site commissioning
Results: BIW cycle time 90 seconds per vehicle, first-article pass rate 98.8%, project cycle shortened by 2 months
1-hour rapid response · technical selection support · stock of critical wear parts