press hydraulics · die guidance · pneumatic feeding · lubrication and cooling · sensing and inspection · electrical control
Stamping and die-casting shops are central to forming automotive parts, using large presses to process sheet metal or molten aluminum into body panels, structural parts, chassis parts, and more. Shenpu Industrial provides complete automation component solutions for stamping / die-casting lines, covering press hydraulics, die guidance, pneumatic feeding, lubrication and cooling, sensing and inspection, electrical control, and other key areas, to help ensure forming quality and production efficiency.
Rexroth / Parker proportional valves, servo valves, and hydraulic power units, pressure 0–400 bar, flow 50–500 L/min, paired with pressure sensors, flow meters, and filters to help ensure press accuracy and stability.
Misumi MISUMI/PUNCH guide pillars and bushings, nitrogen gas springs, floating pins, specifications Φ25-100mm, stroke 50-300mm, Accuracy C3/H7, paired with spring stripper plates and ejector systems.
Festo/SMC pneumatic slides MEY/MXS, cylinders CDQ/CQ, stroke 500-3000mm, Speed 0.1-2m/s, paired with vacuum cups PIAB, balancer beams, achieve sheet metal automation loading and unloading.
SKF/Lincoln Lincoln automatic lubrication systems, Eaton EATON oil coolers, flow 0.1-10L/min, Temperature control±2℃, paired with oil-mist separators and oil-water separators, extend die life.
Keyence laser distance measurement LR-X, Pepperl+Fuchs ultrasonic sensors UC, TURCK photoelectric sensors, inspection molds clearance/sheet metal thickness/part presence, response time<5ms, protection IP67.
Siemens S7-1500 PLC, Rexroth IndraMotion servo control, paired with HMI HMI touch panels, servo drives, safety relays, achieve presses automation control and fault diagnostics.
In a stamping shop with five 2500-ton presses, the hydraulic systems used a lot of energy, with annual electricity costs of more than RMB 3 million.
Solutions: Upgraded a Rexroth servo-driven hydraulic system with variable-displacement pumps and energy recovery, cutting energy use by 40%, saving RMB 1.2 million a year in electricity, with a payback period of <30 months.
On an automaker’s stamping dies, the original guide pillars and bushings wore quickly, causing ±0.1 mm dimensional deviation and a 92% pass rate.
Solutions: Replaced with MISUMI high-accuracy C3 guide pillars and bushings, nitrogen gas springs, and an automatic lubrication system, extending die life by 50% and raising the pass rate to 99.2%.
On an OEM stamping line, loading and unloading were originally manual, requiring 12 people per shift, with low efficiency and high safety risk.
Solutions: Deployed Festo pneumatic feeding robots, PIAB vacuum cups, and Keyence double-sheet detection for fully automatic loading and unloading, reducing manual labor to two people and shortening cycle time from 15 seconds to 12 seconds.
At a parts company, manual visual inspection had a 3–5% escape rate, allowing defective parts into downstream processes.
Solutions: Introduced Keyence LR-X laser distance sensors and a vision inspection system for 100% in-line inspection, reducing the escape rate to below 0.2%, with PLC automatic reject of defective parts.
Where technical requirements are met, we provide high-value domestic alternative solutions that can reduce procurement costs by 30–50%.
Beijing Huade, Yuci Yuken, and Taiwan Yuken piston pumps, proportional valves, and hydraulic cylinders, with performance close to Rexroth/Parker, priced 50–60% lower.
Longkee, PUNCH, and Dongguan Pinzheng guide pillars and bushings, nitrogen gas springs, and floating pins, accuracy H7/C5, priced at about 40–50% of MISUMI.
AirTAC AirTAC, Mindman Mindman, cylinders/slides/vacuum cups, performance close to Festo/SMC, price reduced by 40-50%.
Projects: Annual MRO purchasing for 10 presses in a stamping shop
Scope of supply:Rexroth hydraulics components, Misumi molds standard parts, Festo pneumatic components, Keyence sensors, SKF lubrication systems, and more spare-parts kits
Engagement model: annual framework agreement + VMI consignment warehouse + technical support
Results: Emergency spare-parts response shortened from 48 hours to 8 hours, annual purchasing cost reduced by 22%
Projects: A stamping-line automation retrofit project
Scope of supply:Festo pneumatic feeding systems, PIAB vacuum cups, Keyence dual-material inspection, Siemens PLC control systems
Engagement model: integrated design + one-stop supply + on-site commissioning
Results:production efficiency improve 30%, manual cost reduced by 60%, payback period 18 months
1-hour rapid response · technical selection support · stock of critical wear parts
Contact us →