Assembly-line conveyor drives · Tightening tools · Sensing and inspection · Standard-part consumables · AGV logistics · Electrical control
The final-assembly shop is the last stage of vehicle production, covering powertrain assembly, chassis marriage, interior installation, glass installation, and more. Shenpu Industrial provides complete automation component solutions for final-assembly lines, covering conveyor drives, tightening tools, sensing and inspection, standard-part consumption, AGV logistics, electrical control, and other key areas, to help ensure assembly quality and takt time.
Atlas Copco electric tightening tools, Desoutter intelligent tightening systems, Ingersoll Rand pneumatics wrenches, Torque range 0.5-300Nm, Accuracy±3%, paired with controllers records each bolt Torque/angle curves.
SEW geared motors, Lenze servo drives, Nord gearboxes, paired with chain conveyors, roller conveyors, overhead EMS conveyors, Speed 0.1-10m/min, Payload 100-2000kg.
Keyence laser distance measurement LR-X, Pepperl+Fuchs proximity switches NBN, TURCK photoelectric sensors, inspection vehicle body positioning/part presence/assembly quality, response time<5ms.
Standard parts such as bolts, nuts, clips, seals, and harness clamps, with Würth / Bossard automated feeding systems, and barcode traceability for each bolt batch and inventory.
KUKA/Dematic AGV carts, Payload 500-1500kg, navigation accuracy±10mm, paired with MES/WMS systems achieve powertrain, seats, instrument panels automatic delivery.
Siemens S7-1500 PLC, Omron NJ/NX series, Beckhoff EtherCAT bus, paired with HMI HMI touch panels, RFID readers, barcode scanners, achieve full-line traceability and error-proofing.
On a joint-venture automaker’s final-assembly line, the original pneumatic wrenches had no torque records, leading to poor chassis-bolt tightening consistency and a high rate of after-sales abnormal-noise complaints.
Solutions: Deployed an Atlas Copco electric tightening system with a Power Focus controller to record the torque/angle curve of every bolt and upload it to the MES, achieving 100% traceability and reducing abnormal-noise complaints by 60%.
On an OEM final-assembly EMS overhead conveyor, annual electricity costs exceeded RMB 1.5 million, a high share of energy use.
Solutions: Upgraded SEW inverters, energy-saving modules, and smart sleep, lowering motor power from 90 kW to 65 kW, with 35% annual energy savings and a payback period of <24 months.
On a new-energy automaker’s final-assembly line, powertrains were originally delivered manually, requiring eight people per shift, with low efficiency and a high error rate.
Solutions: Introduced KUKA AGVs with an MES dispatch system for automatic delivery of powertrains, seats, and instrument panels, reducing manual labor to two people and raising delivery accuracy from 92% to 99.8%.
At an automaker’s chassis marriage station, manual visual inspection had a 1–2% missed-assembly rate, affecting vehicle safety.
Solutions: Deployed a Keyence vision inspection system and TURCK photoelectric sensors for 100% in-line inspection, reducing missed-assembly escape to below 0.05%, with PLC automatic alarms and line stop.
Where technical requirements are met, we provide high-value domestic alternative solutions that can reduce procurement costs by 30–50%.
Chery Precision, Ruima, Bosch Rexroth domestic Model, electric tightening tools Torque range 5-200Nm, Accuracy±5%, price about Atlas Copco 50-60%.
SEW domestic models and Delta / Yaskawa domestic series, power 0.37–7.5 kW, reduction ratio 10–100, priced 40–50% lower, suitable for conveyor-line retrofits.
Autonics, Panasonic/Omron(domestic Model), proximity switches, photoelectric switches, laser distance measurement, cost reduced by 30-40%.
Projects:final-assembly shop 500 stations annual MRO procurement
Scope of supply:tightening tools(Atlas Copco/Desoutter), geared motors(SEW/Lenze), sensors(Keyence/Pepperl+Fuchs), standard parts(Wuerth), electrical components, and more spare-parts kits
Engagement model: annual framework agreement + VMI consignment warehouse + technical support
Results: Emergency spare-parts response shortened from 48 hours to 6 hours, annual purchasing cost reduced by 20%
Projects:final-assembly lines new projects paired with
Scope of supply:Atlas Copco tightening systems, SEW conveyor drives, KUKA AGV, Keyence sensors, Siemens PLC
Engagement model: integrated design + one-stop supply + on-site commissioning
Results:per vehicle assembly takt time 60 seconds, first-article pass rate 99.2%, project cycle shortened by 3 months
1-hour rapid response · technical selection support · stock of critical wear parts
Contact us →